If you own an older house in Newport or Bristol, you may have wondered whether solar is even an option. The honest answer is that it depends on where your home sits, which side of it faces the street, and what the local Historic District Commission decides. This guide explains what each commission reviews, where panels have a realistic chance of approval, and how the commission fits alongside the statewide solar permit and your utility paperwork.

We are a family-owned company based in Warwick since 2017, with 4,000+ projects (solar and roofing) across Rhode Island, Massachusetts and Connecticut. This is a plain-language guide to the process. Everything about the commissions below comes from the city and town pages, linked at the end.

First, Find Out If Your Home Is in a Local Historic District

Not every old house is covered. Newport describes a Local Historic District, created by a 1965 ordinance, with other local zones designated since. The city’s historic preservation page says that before beginning any exterior work in the Local Historic District, an owner or authorized representative must fill out a Certificate of Appropriateness application. Newport also provides an address lookup on its historic district map.

Bristol’s Historic District Commission was created in 1987, and Chapter 14 of the Bristol Town Code gives it authority to approve or deny proposed exterior work on any property in the local historic district. Interior work is not reviewed.

Start with your address, then call the town.

What the Commissions Actually Review

Both commissions are design review bodies. In Bristol, the Commission reviews work that affects the exterior appearance of a designated property or its setting, and some minor items are handled by staff through an Administrative Review. Bristol is explicit about one point that surprises people: the Certificate of Appropriateness is required even if no building permit is needed.

Newport has gone further and written down how it thinks about solar.

Where Newport’s Draft Policy Stands on Solar Panels

Newport’s Historic District Commission has a Policy Statement on Solar Panels. A caution: the version posted in the Commission’s March 2022 agenda materials is labeled DRAFT, and its adoption date is blank. We describe what it says, not a final adopted rule. Confirm the current standard with the city before you design anything.

In plain terms, the draft says:

  • Roof panels in a Newport Historic District are typically not allowed, on contributing or non-contributing buildings.
  • A location that cannot be seen from the ground will generally meet the standards, but every project is evaluated on its own merit.
  • Panels should not be installed on a roof that can be seen in any fashion from a street view vantage point.
  • Panels should not go on a prominent roof made of slate, standing-seam metal, wood shingle or tile, and should not require removing or altering dormers, chimneys or other roof features.
  • Panels and mounts should be compatible in color with the roof, and mechanical equipment should be as unobtrusive as possible and on the rear slope.

So here is the straight answer for a street-facing roof slope on a Newport historic home: it is unlikely to be approved. If a plan depends on that slope, expect a denial or a request to move the panels. We would rather say so now than after you have paid for design work.

Placement Options That May Be Considered

The same draft lists several places where panels may be considered. None are promised.

A rear slope that cannot be seen from the street. This is the strongest starting point. For non-contributing buildings with a low slope, the draft contemplates panels installed flat on the rear slope without altering the roof pitch.

A completely flat roof, set back from the edge. Pitch and elevation should be adjusted to avoid views from the public right of way.

A recent addition. If an addition is clearly not part of the original historic structure and has not gained historic significance on its own, and the panels are not in public view, the draft says they may be considered.

A separate structure or ground mount. The draft says panels may be considered if installed on the property, separate from the historic building (it gives a pole mounted array as an example), as long as they do not interfere with historic landscaping or walls. Whether your lot has room, and whether a ground mount is acceptable in your zone, is something to raise with the Preservation Planner early. Bristol’s pages we reviewed do not address solar placement specifically, so ask the Bristol HDC Coordinator what the Commission expects.

The Certificate of Appropriateness, Step by Step

The two towns run the process a little differently. Here is the sequence, using each town’s published steps.

  1. Confirm your district status. Use Newport’s historic district map or call the Bristol HDC Coordinator.
  2. Ask about a concept review. Bristol offers an optional Concept Review so you can discuss general ideas with the Commission before applying, and recommends it at the planning stage.
  3. Assemble the application. Bristol says an application needs photographs and written specifications, and may include architectural drawings. Newport’s solar draft adds a project-specific list (see below).
  4. File online. Bristol uses its online portal and posts a meeting schedule with filing deadlines. Newport’s Certificate of Appropriateness is requested online through its Viewpoint Cloud portal.
  5. Attend the meeting. Bristol meets once a month, meetings are open to the public, and each application is open for public comment. The Commission can approve as submitted, approve as noted, approve in concept, continue the review, or deny.
  6. If approved, you receive the Certificate. In Bristol, a copy goes to the Building Inspector’s Office if a building permit is required, and approvals are good for one year. If work has not begun in that year, a new application is needed.
  7. If denied, you have options. Bristol says you can amend and resubmit, wait one calendar year to submit an unamended application, or appeal to the Zoning Board of Review.

What to Bring to the Commission

Newport’s draft statement says that for all projects, the application must include solar panel cut sheets, an aerial view of the panel layout, mounting bracket detail, and the positions of any exterior mechanical equipment and batteries. That list is a good template for Bristol too, since a complete package is what keeps an application from stalling. Add clear photos of every elevation and the roof material.

If your roof is near the end of its life and you are weighing a replacement first, our guide on whether to replace your roof before installing solar covers the order of work. On a historic home, roofing material changes can also be reviewed, so raise that with the Commission too.

How the Commission Fits With the Statewide Solar Permit

Rhode Island has a single statewide solar permit application. Under the state rules, it encompasses both building and electric permits for solar photovoltaic systems, and municipalities have been required to use it beginning on January 1, 2018.

That permit and the Commission’s Certificate of Appropriateness are different approvals with different reviewers. Newport and Bristol both say the Certificate of Appropriateness comes first for exterior work in a local district, and in Bristol a denial means no building permit is issued. The practical order is: Commission first, then the permit, then installation.

Rhode Island Energy and Interconnection

After the installation passes local inspection, the utility interconnects the system. The state’s Guide to Going Solar says the electrical inspector signs off, then the utility connects the system and emails permission to turn it on. Rhode Island Energy is the utility for Newport and Bristol, and we handle the interconnection application with them as part of the job.

Net Metering or REG: You Pick One

The same state guide says homeowners can choose one incentive, but not both. Under net metering, excess power sent to the grid generates credits that offset your electric bill. Under the Renewable Energy Growth (REG) program, the arrangement is a fixed price, long term tariff. They use different meter setups too, and the choice is made on the interconnection application, so it needs to be settled before filing.

We quote no rates here. For how each works, read our pages on net metering in Rhode Island and our REG program explainer.

A Realistic Way to Start

Check your district status, call the commission staff, and ask whether a rear slope, addition, flat roof or separate mount is worth bringing forward. If the answer on every option is no, that is useful to know before you commit to anything. If you want a second set of eyes on your roof and layout, see our pages for Newport, Bristol and the wider Rhode Island service area.

Ready to talk it through? Call us at (401) 298-8040 or request a quote. Our in-house crews handle the work, and we hold a BBB A+ rating and 4.8 stars on Google.

Frequently Asked Questions

Do I need Historic District Commission approval for solar in Newport or Bristol?

If your home is inside a local historic district, yes. Newport asks owners to file a Certificate of Appropriateness application before any exterior work in the Local Historic District. Bristol requires a Certificate of Appropriateness for exterior work in its Local Historic District, even when no building permit is needed. Check your address with each town before you plan anything.

Can I put solar panels on the front of a historic house in Newport?

Probably not. Newport’s Historic District Commission draft policy statement says roof panels are typically not allowed in a Newport Historic District and should not be installed on a roof that can be seen from a street view vantage point. Each project is judged on its own merits, so ask the Preservation Planner.

What are the alternatives if the roof is off limits?

Newport’s draft policy says panels may be considered on a completely flat roof set back from the edge, on a recent addition that is clearly not part of the original structure, or on a separate mount on the property that does not disturb historic landscaping or walls. Whether any of those fit your lot is a Commission decision.

Does the Commission approval replace the statewide solar permit?

No. They are separate steps. Rhode Island has one statewide solar permit application that covers both building and electrical review, and municipalities have had to use it since January 1, 2018. In a historic district, the Commission’s Certificate of Appropriateness is reviewed on its own.

Can I use net metering and the REG program together?

No. The Rhode Island Office of Energy Resources guide says homeowners can choose one incentive, but not both. Your installer indicates which path on the interconnection application, so decide before the paperwork is filed.

How long does Commission review take in Bristol?

Bristol says a complete application goes on the agenda for the next monthly meeting, and most applications are reviewed in a single meeting when all materials are submitted. An incomplete application cannot be reviewed, and approvals are good for one year.

Sources

Get Your Free Solar Quote

Get your free savings report from your local RI, MA and CT team.

Your info is private. We never sell your data.

Thinking about solar for your home?

Get a free, no-pressure quote with the real numbers for your roof, in writing.

Get My Free Quote
Share this article
Get QuoteCall Now